Implementation of a continuous fixed site bridge WIM operation
by
Snyder, Richard E.
Title
:
Implementation of a continuous fixed site bridge WIM operation
Author
:
Snyder, Richard E.
Personal Author
:
Snyder, Richard E.
Physical Description
:
v, 45 leaves : illustrations ; 28 cm
General Note
:
In cooperation with the Federal Highway Administration.
"September, 1986."
Subject Term
:
Bridges -- Live loads -- Testing.
Bridges -- Floors -- Testing.
Added Corporate Author
:
Ohio. Department of Transportation.
Bridge Weighing Systems, Inc.
Library | Material Type | Item Barcode | Shelf Number | Status |
---|
Civil Engineering | Book | B027103 | TG325.6 .S69 1986 | Transportation Collection |