Monitoring of the Bonnet Carré Spillway Bridge during extreme overload
by
 
Ziel, Paul H., author.

Title
Monitoring of the Bonnet Carré Spillway Bridge during extreme overload

Author
Ziel, Paul H., author.

Personal Author
Ziel, Paul H., author.

Physical Description
xiii, 53 pages : illustrations ; 28 cm + 1 CD-ROM (4 3/4 in.)

General Note
"Louisiana Transportation Research"--Cover.
 
"October 2003."

Abstract
This report concerns the monitoring of a portion of the Bonnet Carre Spillway Bridge during an extreme overload. On Tuesday, November 5, 2002, Tulane University was requested to monitoring strain at the bottom flange of two adjacent prestressed girders before, during, and after the passing of the overload. On Thursday, November 7, this request was modified to include monitoring of strain in the following regions of interest: (a) Positive moment region on three adjacent girders; (b) Negative moment region over the pile cap at the center of the bridge width; (c) Positive and negative moment region on one pile cap; (d) Shear region on one pile cap; and (e) Compression region on one square pile. After the monitoring was performed, efforts were made to quantify and reduce the error that may have arisen from necessary compromises. These efforts included additional laboratory testing described in this report.

Subject Term
Bridges -- Louisiana -- Live loads -- Evaluation.
 
Bridges -- Louisiana -- Testing.
 
Acoustic emission testing -- Louisiana.
 
Highway bridges.
 
Strain gages.
 
Flanges.

Added Author
Lamanna, Anthony J.,

Added Corporate Author
Louisiana. Department of Transportation and Development.
 
Louisiana Transportation Research Center.
 
Tulane University. Department of Civil and Environmental Engineering.

Electronic Access
http://www.ltrc.lsu.edu/pdf/report_378.pdf


LibraryMaterial TypeItem BarcodeShelf NumberStatus
Civil EngineeringBookB029735TG305 .Z54 2003Transportation Collection
Civil EngineeringSupplementary CD-ROMROM2215TG305 .Z54 2003 EK.1Transportation Collection