Cover image for Site Engineering Workbook.
Site Engineering Workbook.
Title:
Site Engineering Workbook.
Author:
Woland, Jake.
ISBN:
9781118418734
Personal Author:
Edition:
2nd ed.
Physical Description:
1 online resource (160 pages)
Contents:
Site Engineering for Landscape Architects Workbook: To Accompany Site Engineering for Landscape Architects, Sixth Edition -- Copyright -- Contents -- Introduction -- Observations -- Short-Answer Questions -- Long-Answer Questions -- Graphic Questions -- Questions -- Chapter 1: Site Engineering IS Design -- 1.1 -- 1.2 -- 1.3 -- 1.4 -- 1.5 -- 1.6 -- Chapter 2: Grading Constraints -- 2.1 -- 2.2 -- 2.3 -- 2.4 -- 2.5 -- 2.6 -- 2.7 -- 2.8 -- 2.9 -- 2.10 -- 2.11 -- 2.12 -- 2.13 -- 2.14 -- 2.15 -- 2.16 -- Chapter 3: Contours and Form -- 3.1 -- 3.2 -- 3.3 -- 3.4 -- 3.5 -- 3.6 -- 3.7 -- 3.8 -- 3.9 -- 3.10 -- 3.11 -- 3.12 -- 3.13 -- 3.14 -- Chapter 4: Interpolation and Slope -- 4.1 -- 4.2 -- 4.3 -- 4.4 -- 4.5 -- 4.6 -- 4.7 -- 4.8 -- Chapter 5: Grading of Simple Design Elements -- 5.1 -- 5.2 -- 5.3 -- 5.4 -- 5.5 -- 5.6 -- 5.7 -- 5.8 -- 5.9 -- 5.10 -- Chapter 6: Grading Process -- 6.1 -- 6.2 -- 6.3 -- 6.4 -- 6.5 -- 6.6 -- 6.7 -- 6.8 -- Chapter 7: Soils in Construction -- 7.1 -- 7.2 -- 7.3 -- 7.4 -- 7.5 -- 7.6 -- 7.7 -- 7.8 -- 7.9 -- 7.10 -- 7.11 -- 7.12 -- 7.13 -- 7.14 -- 7.15 -- 7.16 -- 7.17 -- 7.18 -- 7.19 -- 7.20 -- 7.21 -- 7.22 -- Chapter 8: Earthwork -- 8.1 -- 8.2 -- 8.3 -- 8.4 -- 8.5 -- Chapter 9: Storm Water Management -- 9.1 -- 9.2 -- 9.3 -- 9.4 -- 9.5 -- 9.6 -- 9.7 -- 9.8 -- 9.9 -- 9.10 -- 9.11 -- 9.12 -- 9.13 -- Chapter 10: Storm Water Management System Components -- 10.1 -- 10.2 -- 10.3 -- 10.4 -- 10.5 -- 10.6 -- 10.7 -- 10.8 -- 10.9 -- 10.10 -- 10.11 -- 10.12 -- 10.13 -- 10.14 -- 10.15 -- 10.16 -- 10.17 -- 10.18 -- 10.19 -- Chapter 11: Soil Erosion and Sediment Control -- 11.1 -- 11.2 -- 11.3 -- 11.4 -- 11.5 -- 11.6 -- 11.7 -- 11.8 -- 11.9 -- 11.10 -- Chapter 12: Determining Rates and Volumes of Storm Runoff: The Rational and Modified Rational Methods -- 12.1 -- 12.2 -- 12.3 -- 12.4 -- 12.5 -- 12.6 -- 12.7 -- 12.8 -- 12.9 -- 12.10 -- 12.11.

12.12 -- 12.13 -- 12.14 -- 12.15 -- 12.16 -- Chapter 13: Natural Resources Conservation Service Methods of Estimating Runoff Rates, Volumes, and Required Detention Storage -- 13.1 -- 13.2 -- 13.3 -- 13.4 -- 13.5 -- 13.6 -- Chapter 14: Designing and Sizing Storm Water Management Systems -- 14.1 -- 14.2 -- 14.3 -- 14.4 -- 14.5 -- 14.6 -- 14.7 -- 14.8 -- 14.9 -- 14.10 -- 14.11 -- 14.12 -- 14.13 -- Chapter 15: Site Layout and Dimensioning -- 15.1 -- 15.2 -- 15.3 -- 15.4 -- 15.5 -- 15.6 -- 15.7 -- 15.8 -- 15.9 -- 15.10 -- 15.11 -- 15.12 -- 15.13 -- 15.14 -- 15.15 -- 15.16 -- 15.17 -- Chapter 16: Horizontal Road Alignment -- 16.1 -- 16.2 -- 16.3 -- 16.4 -- 16.5 -- 16.6 -- 16.7 -- 16.8 -- 16.9 -- 16.10 -- 16.11 -- 16.12 -- 16.13 -- Chapter 17: Vertical Road Alignment -- 17.1 -- 17.2 -- 17.3 -- 17.4 -- 17.5 -- 17.6 -- 17.7 -- 17.8 -- 17.9 -- 17.10 -- Answers -- Chapter 2: Grading Constraints -- 2.7 -- 2.8 -- 2.9 -- 2.10 -- 2.11 -- 2.12 -- 2.13 -- 2.14 -- 2.15 -- 2.16 -- Chapter 3: Contours and Form -- 3.6 -- 3.7 -- 3.8 -- 3.9 -- 3.10 -- 3.11 -- 3.12 -- 3.14 -- Chapter 4: Interpolation and Slope -- 4.1 -- 4.2 -- 4.3 -- 4.4 -- 4.5 -- 4.6 -- 4.7 -- 4.8 -- Chapter 5: Grading of Simple Design Elements -- 5.1 -- 5.2 -- 5.3 -- 5.4 -- 5.5 -- 5.6 -- 5.7 -- 5.8 -- 5.9 -- 5.10 -- Chapter 6: Grading Process -- 6.1 -- 6.2 -- 6.3 -- 6.4 -- 6.5 -- 6.6 -- 6.7 -- 6.8 -- Chapter 7: Soils in Construction -- 7.3 -- 7.4 -- 7.5 -- 7.6 -- 7.7 -- 7.8 -- 7.9 -- 7.10 -- 7.11 -- 7.12 -- 7.13 -- 7.14 -- 7.15 -- 7.16 -- 7.17 -- 7.18 -- 7.19 -- 7.20 -- 7.21 -- 7.22 -- Chapter 8: Earthwork -- 8.1 -- 8.2 -- 8.3 -- 8.4 -- 8.5 -- Chapter 9: Storm Water Management -- 9.2 -- 9.3 -- 9.4 -- 9.5 -- 9.6 -- 9.7 -- 9.8 -- 9.9 -- 9.10 -- 9.11 -- 9.12 -- 9.13 -- Chapter 10: Storm Water Management System Components -- 10.4 -- 10.5 -- 10.6 -- 10.7 -- 10.8 -- 10.9 -- 10.10 -- 10.11 -- 10.12 -- 10.13.

10.14 -- 10.15 -- 10.16 -- 10.17 -- 10.18 -- 10.19 -- Chapter 11: Soil Erosion and Sediment Control -- 11.3 -- 11.4 -- 11.5 -- 11.6 -- 11.7 -- 11.8 -- 11.9 -- 11.10 -- Chapter 12: Determining Rates and Volumes of Storm Runoff: The Rational and Modified Rational Methods -- 12.1 -- 12.2 -- 12.3 -- 12.4 -- 12.5 -- 12.6 -- 12.7 -- 12.8 -- 12.9 -- 12.10 -- 12.11 -- 12.12 -- 12.13 -- 12.14 -- 10-minute hydrograph -- 20-minute hydrograph -- 40-minute hydrograph -- 12.15 -- 12.16 -- Chapter 13: Natural Resources Conservation Service Methods of Estimating Runoff Rates, Volumes, and Required Detention Storage -- 13.1 -- 13.2 -- Chapter 14: Designing and Sizing Storm Water Management Systems -- 14.1 -- 14.2 -- 14.3 -- 14.4 -- 14.5 -- 14.6 -- 14.7 -- 14.8 -- 14.9 -- 14.10 -- 14.11 -- Laterals -- Main line -- 14.12 -- 14.13 -- Chapter 15: Site Layout and Dimensioning -- 15.2 -- 15.3 -- 15.4 -- 15.5 -- 15.6 -- 15.7 -- 15.8 -- 15.9 -- 15.10 -- 15.11 -- 15.12 -- 15.13 -- 15.14 -- 15.15 -- 15.16 -- 15.17 -- Chapter 16: Horizontal Road Alignment -- 16.2 -- 16.3 -- 16.4 -- 16.5 -- 16.6 -- 16.7 -- 16.8 -- 16.9 -- 16.10 -- Curve 1 -- Curve 2 -- Curve 3 -- 16.11 -- 16.12 -- 16.13 -- Chapter 17: Vertical Road Alignment -- 17.2 -- 17.3 -- 17.4 -- 17.5 -- 17.6 -- 17.7 -- 17.8 -- 17.9 -- Curve 1 -- Curve 2 -- 17.10.
Abstract:
JAKE WOLAND is a landscape architect with HEWITT in Seattle.
Local Note:
Electronic reproduction. Ann Arbor, Michigan : ProQuest Ebook Central, 2017. Available via World Wide Web. Access may be limited to ProQuest Ebook Central affiliated libraries.
Electronic Access:
Click to View
Holds: Copies: