Cover image for Design of roadside barrier systems placed on MSE retaining walls
Design of roadside barrier systems placed on MSE retaining walls
Title:
Design of roadside barrier systems placed on MSE retaining walls
Author:
Bligh, Roger P.
ISBN:
9780309154994
Publication Information:
Washington, D.C. : Transportation Research Board, 2010.
Physical Description:
184 p. : ill., charts ; 28 cm.
Series:
NCHRP report, 663

Report (National Cooperative Highway Research Program) ; 663.
General Note:
At head of title: National Cooperative Highway Research Program.

"Research sponsored by the American Association of State Highway and Transportation Officials in cooperation with the Federal Highway Administration."
Contents:
Ch. 1. Introduction -- Ch. 2. State of the Practice -- Design of MSE Wall -- Design of Barrier -- Design of the Barrier on Top of the MSE Wall -- Survey of State Transportation Agencies -- Ch. 3. Barrier Stability Study -- Description of Barrier -- Static Analyses and Static Test -- Dynamic Analyses and Dynamic Test -- Ch. 4. Reinforcement Pullout Tests -- Rate of Loading -- Saturation -- Fines -- Reinforcement -- Number of Tests -- Procedure (Soil Installation, Rate of Loading, Testing) -- Results and Conclusion -- Ch. 5. 5 ft High MSE Wall and Barrier Study -- 5 ft High MSE Wall and Barrier Test Plan -- Finite Element Analysis -- Bogie Test -- Summary of Bogie Tests -- Comparison of Test and Numerical Simulation -- Ch. 6. 10 ft High MSE Wall and Barrier Study -- 10 ft High MSE Wall and Barrier Study Description -- Finite Element Analysis -- TL-3 Crash Test -- Ch. 7. Design Guidelines -- Guidelines for the Barrier -- Guidelines for the Wall Reinforcement -- Guidelines for the Wall Panel -- Data to Back Up Guidelines -- Ch. 8. Summary and Conclusions -- Summary of Studies and Tests.
Abstract:
TRB's National Cooperative Highway Research Program (NCHRP) Report 663: Design of Roadside Barrier Systems Placed on MSE Retaining Walls explores a design procedure for roadside barrier systems mounted on the edge of a mechanically stabilized earth (MSE) wall. The procedures were developed following American Association of State Highway and Transportation Officials Load and Resistant Factor Design (LRFD) practices. Appendices A through H to NCHRP Report 663 are available online. Titles of Appendices A through H are as follows: Appendix A: Design of MSE Wall; Appendix B: State-of-Practice Survey; Appendix C: Detailed Drawing of MSE Wall for Bogie Test; Appendix D: Bogie Test MSE Wall Construction Procedure; Appendix E: Detailed Drawing of MSE Wall for TL-3 Test; Appendix F: TL-3 MSE Wall Construction Procedure; Appendix G: Crash Test Vehicle Properties and Information; Appendix H: Crash Test Sequential Photographs-- Source other than Library of Congress.
Added Author:
Holds: Copies: