Search Results for - Narrowed by: Civil Engineering - Midwest States Regional Pooled Fund Program.SirsiDynix Enterprisehttps://catalog.iyte.edu.tr/client/en_US/default/default/qf$003dLIBRARY$002509Library$0025091$00253AINSAAT$002509Civil$002bEngineering$0026qf$003dAUTHOR$002509Author$002509Midwest$002bStates$002bRegional$002bPooled$002bFund$002bProgram.$002509Midwest$002bStates$002bRegional$002bPooled$002bFund$002bProgram.$0026ps$003d300?2024-05-29T00:09:30ZDevelopment and evaluation of a tie-down system for the redesigned F-shape concrete temporary barrierent://SD_ILS/0/SD_ILS:3911352024-05-29T00:09:30Z2024-05-29T00:09:30Zby Polivka, Karla A.<br/>Format: Books<br/>Embankment widening and slopes for energy absorbing end terminalsent://SD_ILS/0/SD_ILS:4086592024-05-29T00:09:30Z2024-05-29T00:09:30Zby Paulsen, Tony J.<br/>Format: Books<br/>Safety performance evaluation of Minnesota's low-height, temporary rigid panel sign standent://SD_ILS/0/SD_ILS:3910782024-05-29T00:09:30Z2024-05-29T00:09:30Zby Polivka, Karla A.<br/>Format: Books<br/>Analysis of sign attachments to breakaway luminaire supportsent://SD_ILS/0/SD_ILS:3910762024-05-29T00:09:30Z2024-05-29T00:09:30Zby Nelson, Ryan M.<br/>Format: Books<br/>Development of a tie-down system for temporary concrete barriersent://SD_ILS/0/SD_ILS:3910802024-05-29T00:09:30Z2024-05-29T00:09:30Zby Bielenberg, Bob W.<br/>Format: Books<br/>Guardrail and guardrail terminals installed over curbs : phase IIent://SD_ILS/0/SD_ILS:3911012024-05-29T00:09:30Z2024-05-29T00:09:30Zby Polivka, Karla A.<br/>Format: Books<br/>Concept development of a short-radius guardrail system for intersecting roadwaysent://SD_ILS/0/SD_ILS:3911462024-05-29T00:09:30Z2024-05-29T00:09:30Zby Bielenberg, Bob W.<br/>Format: Books<br/>Development of a 7.62-m long span guard rail system--Phase IIent://SD_ILS/0/SD_ILS:3911692024-05-29T00:09:30Z2024-05-29T00:09:30Zby Polivka, Karla A.<br/>Format: Books<br/>